Watch it work▶ Try it on your own figures — free

3 of 11 items are priced 25% or more away from the benchmark, $149.9K apart.

11 items. Your estimate is $2.2M against a benchmark of $2M, a gap of $134.3K. 3 items are flagged.

Check Cabling (m) first. MEP has the most value flagged.

A benchmark is an average of other jobs: site conditions, specification and market timing are not in the data, so this is a check, not a quotation.

$149.9K
3/11
Items off benchmark
3
11
Value apart from benchmark
$149.9K
Biggest difference (%)
42
Share flagged
27%

Why rows were flagged

3
  • Rate 25% or more below benchmark67%
  • Rate 25% or more above benchmark33%

Value flagged by Trade

  • MEP$71.4K
  • Finishes$51.2K
  • Envelope$27.3K

Items to check, largest value first

ItemTradeValueVs benchmark %Why
Cabling (m)MEP$71.4K25Rate 25% or more below benchmark
Floor tiles (m2)Finishes$51.2K42Rate 25% or more above benchmark
Waterproofing (m2)Envelope$27.3K38Rate 25% or more below benchmark

What to do this week

  • Check the rate on Cabling (m): it is the largest difference to the benchmark.
  • Review the MEP trade: it has the most value flagged.
  • Treat low rates as risk, not savings: ask what is missing from the price.

Do

  • Compare every rate with a benchmark before adding contingency.

Don't

  • Don't accept a very low rate as a saving until you know the scope it covers.

How to improve

  • Add the specification level per item so the next report can adjust the benchmark.
  • Add the project location so the next report can apply a regional cost factor.

Demo

Try it now — free

Type your figures (or fill in samples) and get the answer in a minute.

Start from a template

Make it decision-ready

Also include

No card · no API key · your figures are not stored

Overview

Estimating software sells you a national average adjusted by a location factor. Every builder knows that number is wrong for them, because the one that matters is what this business paid these suppliers in this city last quarter — which no database holds.

This agent estimates from your own data: your rate card, your recent projects, the quotes you have on file. It works by specification level, so a shell, a finished building and a finished and furnished one are three separate answers rather than one number with a shrug, and every rate carries where it came from and how old it is.

The part that saves the money is the exclusions list. Projects rarely overrun because a rate was slightly wrong; they overrun because the estimate silently excluded site works, connections, temporary works or fees, and nobody recorded that it had. Here everything outside the number is written down, and anything with no rate behind it is reported as unpriced rather than filled with an average.

Benefits

Estimates you can defend

Every rate traceable to a project or a quote you actually hold.

The overrun found early

In the exclusions list rather than in month six.

Faster than the spreadsheet

And it does not carry last project's mistakes forward.

What it does

  • Your rates, not a national average

    What you actually paid, from your rate card and your past projects, with the date on each.

  • Three specification levels, three answers

    Shell, finished, finished and furnished. One number covering all three is not an estimate.

  • Writes down what it excluded

    Site works, connections, temporary works, fees. Projects overrun on the exclusions nobody recorded, not on the rate.

  • Unpriced is unpriced

    An item with no rate behind it is reported as such, never filled in with something plausible.

  • Ages every rate

    A rate from eighteen months ago is labelled as one. Materials move, and a stale rate is a quiet loss.

  • States the confidence

    Built from three past projects or from thirty — the answer looks the same and is not.

What this changes

What this changes about your week

It takes over
Pricing a project from a spreadsheet that carries last project's mistakes forward.
Done today by
The owner or an estimator, under time pressure, before a deadline.
How often
Every enquiry.
Typical manual effort
A defensible estimate is a day per project.

Why Construction in particular. Estimating software sells a national average adjusted by a location factor, which every builder knows is wrong for them. This uses what you actually paid — and writes down the exclusions, which is where projects overrun rather than on the rate.

  • Runs unattended

    Started by you or by an event, and it finishes on its own. Nothing waits for someone to be at a desk.

  • The same standard every time

    The two-hundredth item is held to the bar the first one was. Consistency is the part people cannot sustain.

  • It cannot act on its own

    Build Cost Estimator has no path to sending, spending or committing. That limit is why its output is safe to act on.

How it runs

This agent runs server-side through the PROMIVO runtime. Each run is logged step by step and every tool call is permission-checked before it executes.

  1. 1InputValidated against the agent input schema
  2. 2Modelclaude-opus-5 with automatic fallback
  3. 3Toolssearch_knowledge, extract_structured_data
  4. 4PermissionsRuns READ actions automatically; anything higher waits for approval
  5. 5OutputStructured result matching the output schema
  6. 6LoggingTokens, duration and every step recorded

Requirements

Integrations

No integrations required.

Before you start

  • The areas and specification level
  • A knowledge base holding your rate card, past project costs or supplier quotes
  • Requires the All-Access plan or higher

Use cases

Pricing a new enquiry

A defensible range from your own history, in minutes.

Budget conversations

What the client's number actually buys, by specification level.

Reviewing a subcontractor's price

Against what you have paid before for the same work.

Pricing

All-Access

Billed monthly through your PROMIVO subscription. Cancel at any time.

Runs consume your plan allowance for agent executions and tokens. See plan limits

FAQ

Does it include a cost database?

No, deliberately. A national average adjusted by a location factor is wrong for your business, and selling you one would be selling confidence. It uses your rates, and says so when you have none for something.

What if we have no historic data?

It reports the items as unpriced and tells you which rates to establish first. That list is worth more than an invented total, which you would find out when the tender came back.

Is this a formal cost plan?

No. It is an estimate from your own data for a person to check. A cost plan issued to a client is a quantity surveyor's document with their name on it.

Reviews

Reviews open once customers have run this agent.

Need this agent to work differently?

Tell us what to change and our team will scope a customised version for your business.

Customize this agent